- Cellar was riddled with salt damp. Treating the walls as we would a retaining wall, the walls were repaired section-by-section. The walls were reconstructed in a double-leaf of brickwork and 110 mm core-filled reinforced concrete.
- Cellar was riddled with salt damp. Treating the walls as we would a retaining wall, the walls were repaired section-by-section. The walls were reconstructed in a double-leaf of brickwork and 110 mm core-filled reinforced concrete.
- Cellar was riddled with salt damp. Treating the walls as we would a retaining wall, the walls were repaired section-by-section. The walls were reconstructed in a double-leaf of brickwork and 110 mm core-filled reinforced concrete.